Modify conveyor Wheel increase O.D. to 295mm chamfer one side, bolt to existing boss

A bakery experienced a conveyor breakdown where the belt had tracked to one side causing it to snag and jam, breaking the Mesh belt support rods. Arrow Engineering were called in on Friday at 5pm with the need to get the drive back up and running. As a quick fix a 295mm Acetal disc was turned and bolted to the existing hub, which stopped the belt riding up and over the conveyor wheel, 40 rods were turned and supplied over the weekend and the belt was back up and running for Monday.

Modify conveyor Wheel increase O.D. to 295mm chamfer one side, bolt to existing boss Read More »

Biscuit production back up and running for the New Year

A leading biscuit manufacturing company held their annual maintenance shutdown over the Christmas holiday period and whilst their production staff were off decided to strip and replace a large shaft mount gearbox.

Unfortunately, the new replacement gearbox did not have the same diameter shaft as the new gearbox, which meant that the existing shaft needed to be built up or new sleeves making. Upon inspection it was revealed that the shaft and keyway was badly worn. It was decided that new sleeves would be made and the worn shaft turned down to suit, re-keyed and new sleeves manufactured to suit.

Arrow’s Engineers needed to work through the Christmas period, including Bank Holidays, the job was eventually finished on Sunday 1st of January 2023, 10pm and delivered back at 7am on Monday 2nd January.

On top of this a large Rubber Coated Drive roller was also repaired same day and delivered (50 miles) and delivered back at 7pm.