Modify conveyor Wheel increase O.D. to 295mm chamfer one side, bolt to existing boss
A bakery experienced a conveyor breakdown where the belt had tracked to one side causing it to snag and jam, breaking the Mesh belt support rods. Arrow Engineering were called in on Friday at 5pm with the need to get the drive back up and running. As a quick fix a 295mm Acetal disc was turned and bolted to the existing hub, which stopped the belt riding up and over the conveyor wheel, 40 rods were turned and supplied over the weekend and the belt was back up and running for Monday.

A bakery experienced a conveyor breakdown where the belt had tracked to one side, causing it to snag and jam, breaking the mesh belt support rods. Arrow Engineering were called in on Friday at 5pm with the need to get the drive back up and running.
As a quick fix, a 295mm Acetal disc was turned and bolted to the existing hub, which stopped the belt riding up and over the conveyor wheel. 40 rods were turned and supplied over the weekend, and the belt was back up and running for Monday.
Call out received
Acetal disc turned as quick fix
Turned and supplied over the weekend
Conveyor back up and running
A Friday evening breakdown, a same-day quick fix, and a full weekend turnaround of replacement parts — this is the kind of emergency response our in-house manufacturing makes possible.
Why choose Arrow Engineering.
Years of engineering experience
Solving power transmission problems since 1981.
In-house manufacturing
No third-party subcontracting — tighter quality control, faster turnaround.
One-off or batch production
A single replacement part or a production run — we scale to suit.
Full supporting services
Combine with boring, keying and splining for a finished component.
Need help with your next engineering job?
Send us your drawing or sample part — our engineering team will provide a quote.
