October 2022

No Fun at the Fair…

A fairground ride near Manchester airport was out of commission due to a broken gearbox. The gearbox had failed because it’s housing was cracked and the oil had leaked out and the Worm wheel had worn. This meant that there was no drive and the ride was out of action.

No Fun at the Fair… Read More »

Local Bakery Losing Production

We were called out at 10pm on Saturday by a local Bakery where they were losing production because the Timing Pulley on their Check Weigher had failed. The pulley was Aluminium and driving a 32mm wide timing belt, the aluminium teeth had worn due to the torque and continuous use, causing the belt to slip and then not driving the Check weigher. After identifying the pulley, Arrow manufactured 2 new pulleys out of Stainless Steel and the Check Weigher was back up and running for 2pm on Sunday.

Local Bakery Losing Production Read More »

Shopping Basket
Scroll to Top
Scroll to Top